At this unit, the technology for storage, dosing, and transfer of chemical liquids was developed and implemented. Pipeline routing was optimized through updates to the equipment layout, as well as the civil, electrical, and instrumentation sections. All equipment was coordinated with suppliers and successfully installed.
The project passed 30%, 60%, and 90% 3D model review stages.